The 12 Labours of HSBXL-NG
From Hackerspace Brussels
| Number | Task | Status | what |
| 1 | The Roof | TO DO (stalled) | There are still some leaks near the door and on the back side. Follow the wet spot. To continue when weather is dry. |
| 2 | The heating | DONE (?) | The radiators are installed and working. Heat output is suboptimal, but we're not cold (yet). |
| 3 | The insulation | DONE | |
| 4 | The shelves | busy | Shelves are installed and need to be filled/cleaned up. Some small cupboards still need to find a place |
| 5 | The network | busy (mostly done) | Cabinet moved to new space. Network wiring installed. Still need to migrate the DSL line |
| 6 | The electricity | stalled | We need more power sockets !! The lighting system rework is under way |
| 7 | The kitchen | TO DO | Still need to install the sink and a countertop. Who's in ? |
| 8 | The door | stalled | Garage door wiring is a mess and must be rebuilt from scratch. Access control must be (re-)built. |
| 9 | The projection screen | DONE | |
| 10 | The fridge | TO DO | Have a better accounting system for the drinks. We need to finance our space improvements. :-) |
| 11 | The sign | stalled | Make a nice sign on the street to replace that ugly big-oil advertisement. |
| 12 | The Pit | TO DO | Need to be cleaned up from the grime at the bottom. Better cover needed. |